STA4 V13.1 Latest Changes: ================================================================================== 09.08.2017-Sta4cad preparing the library of DWG drawing has been updated. No need to register for the library STA4 V13.1 Previous changes: ================================================================================== 07.11.2014-Reinforced material was added to the material definition of self-weight. Further definition of the material, in the middle of the wire mesh wall panels were added. 03.11.2014-Concrete building was added masonry roof modeling. 16.10.2014-STA4 control panel on the main menu, the problem Recorder added. 30.09.2014-Form work drawings added optional slab elevation drawing. Form work, columns, beams, ribbed and foundation after drawing, added arrangements drawings edit button. 04.09.2014- Raft, continuous and singular basis of drawings, added reinforcement of basic table hoops in the remaining columns. 02.09.2014-3D screen, rotate and accelerate local added. 29.05.2014-Network lock was made general regulations. 08.05.2014-Data access arrangement floor was added to copy + rotation command of the selected element. 11.04.2014--Mat foundation to the basic, optional design torque average width option is added. 17.03.2014-In the information input, the feature has been added to take the symmetry of the inclined axis. 10.03.2014-Drawing on beam, installation location overlay option is added. 25.02.2014-In the drawings, columns and beams 1 mm and 0mm offset edge boot option is added. 21.02.2014-Shearwall-diaghram seismic load transfer control is added. 13.02.2014-The masonry construction option, the minimum size control is added. 26.11.2013-Indices indices and basic indices of the panel element arrangements are arrangements added. 04.11.2013-Donati bulunmasinda pilye opsiyonu elemanlara göre ayristirilmistir. 24.10.2013-Indices indices and basic indices of the panel element arrangements are arrangements added. 27.09.2013-Data entry on the floor arrangement and collectively selected Beam axle arrangement of the plate and beam misalignment in the arrangement, beam axle is added to modify. 09.09.2013-Data input button on the axle between the measure chosen as otherwise engages with new plug-in, automatic axle Metric feature is added. 03.09.2013--Information On the ribs are drawn vector entry. For rib balancing case of a zoom, the remaining balance is given measure. In addition, risk structures, the outcomes printers, wall effect is added to the table. 14.08.2013-Printer in outcomes, together with the report of the Risky Structure Determination, Risky Structures  Determination Form is added to structure information in the completed Word file. 01.08.2013-Mat foundation of the printer outcomes, it is added additional reinforcement graphics. Matthew basic drawings are double miter option added to the edges. 22.07.2013-The hollow interior-ups on top slab reinforcement distribution, wicker has been added to steel to use. Drawings columns, reinforcement of the upper column is greater than the lower colon, sprouts reinforcement drawing is added. 18.07.2013-The shear force and critical times table selection wand nerve to report Detection of high-risk buildings  option is added. 16.07.2013- Beam in, you wrinkled with the added option of sections can be taken from 3-point sections. Wire off the welded is the steel library, which can be used in adequate condition in the upper bracket reinforcement, TR -type matting steel was added 03.07.2013-Printer for the text, graphical 3D image capture has been added. 04.06.2013-Account of the performance of masonry structures, shear stiffness and shear center table account is added. 31.05.2013-In the performance calculations, reinforcement ratio realization is arranged as columns and beams are optional. The proportion of added reinforcement corrosion is available to all existing dont. 25.05.2013-Mat foundation of basic, basic drawing additional reinforcement is added to the chart to determine the main reinforcement. 07.05.2013-Mat foundation of basic, non-orthogonal system, torque and reinforcement is added to the principal axes of the input 09.04.2013-Different diaphragm or the structure consists of more than one block, the block; R regulation,                     earthquake effects, guncellenmistir considering effects such as peak loads. 30.03.2013-Single-user and the network more secure and fast lock general regulations regarding the work was done. 19.03.2013-In the end zone in the polygon shearwall call was added to the form of titles in the corner joints. 27.02.2013-The warning arose because the virus program update is made. 18.02.2013-Urban Transformation scope of which will be used in accordance with the Regulation of Risk Detection Building,making reporting on risk control is added. 12.01.2013-Column drawing the application, the local scale option was added to the column. 04.01.2013-The earthquake report, Alfas values in non-orthogonal structure, calculating the vector